Bioman BioSTP — Non-Electric Sewage Treatment Plant
Non-Electric Sewage Treatment Plant

Your STP should work.
Not trouble you.

Bioman BioSTP is India's non-electric sewage treatment system — trusted by 400+ commercial projects across South India, built to run without power, operators, or breakdowns.

400+Projects installed
₹1 Cr+Lifecycle savings*
25 yrsDesign life
10/10Lab params passed
The problem

Why most STPs become a headache after installation

Across India, thousands of sewage treatment plants fail — not because of bad design, but because they're too complex for real-world conditions.

  • 01

    Power failure stops treatment

    Conventional STPs depend on continuous electricity — the moment power cuts, treatment stops.

  • 02

    Frequent breakdowns

    Motors, blowers and moving parts wear out and demand constant repair.

  • 03

    Operator dependency

    Trained operators are required every single day to keep the system compliant.

  • 04

    High AMC cost

    Annual maintenance contracts and repairs quietly drain ₹2–5 lakhs a year.

How Bioman solves this

Bioman BioSTP is engineered to work silently in the background — no daily attention required. Once installed, it runs on gravity and biology, not machinery.

  • No moving parts
  • No electrical dependency
  • No daily supervision
  • Stable performance year after year
The mechanism

Anaerobic Biodigestion Reactor Technology (ABRT)

A proven natural process where microorganisms break down waste without oxygen or electricity — sewage flows by gravity, solids settle and decompose, and clear, odour-free water flows out.

Bioman BioSTP six-stage treatment process diagram
STAGE 01

Settler / Equalization Tank

Two–three chambers, 16–24 hrs retention, traps heavier solids before flow continues.

Primary20–30% eff.
STAGE 02

Anaerobic Baffle Reactor

Up-flow chambers in series; sedimentation + anaerobic digestion remove suspended solids.

Secondary65–80% eff.
STAGE 03

Biofilm Filter Media

Biofilm on filter media traps and degrades finer suspended organic particles.

Advanced secondary75–90% eff.
STAGE 04

Reed Bed / PGF

Graded gravel + plants (Reed, Canna, Cyperus) treat remaining pollutants naturally.

Tertiary80–95% eff.
STAGE 05

Disinfection / Ozonation

Chlorine or ozone dosing destroys bacteria, viruses and cysts before discharge.

Post-treatment90–97% eff.
STAGE 06

Percolation Wells

Treated water goes to gardening, irrigation, flushing, or safe ground disposal.

DisposalQuarterly check
Proof, not promises

Real installations. Lab-verified results.

Every claim here is backed by field installations across South India and third-party test data — not lab theory.

400+ installations completed across South India — every one tested and commissioned the same way.

Sample Test Result

Treated water output — tested against APHA 23rd Ed. methods and TNPCB discharge limits
TestResultLimit
BOD (3 days, 27°C)17 mg/L20
COD71 mg/L100
pH @ 25°C8.475.5 – 9.0
TDS821 mg/L2100
TSS20 mg/L100
Total Kjeldahl Nitrogen2.7 mg/L100
Ammonical Nitrogen1.1 mg/L50
Chloride (Cl)37 mg/L100
Oil & GreaseLBDL (DL:4.0) mg/L10
Sulphate (SO4)58 mg/L1000
All 10 parameters within TNPCB discharge limits
Why pay electricity bills for sewage?

Treat sewage naturally — without a single unit of power

A side-by-side of what a conventional STP actually costs you over its lifetime, versus Bioman.

Conventional STP

  • Electricity ₹6–12L / yr
  • Operator & AMC ₹2–5L / yr
  • Repairs Frequent
  • Compliance risk High

Bioman BioSTP

  • Electricity ₹0
  • Operator required None
  • Moving parts Zero
  • Compliance Stable, CPCB/SPCB
₹1 Crore+ Estimated lifecycle savings over 20–25 years for medium-to-large commercial projects*
Built for

Ideal across commercial and institutional projects

🏢

Apartments & Gated Communities

🏨

Hotels & Resorts

🏥

Hospitals

🏫

Schools & Colleges

🏭

Factories & Warehouses

🏘️

Villas & Plotted Layouts

Trusted across South India

A few of our happy clients

See it in action

Installation footage

Zoho at TirunelveliInstalled 80KL Bio STP
Madras Race Club KanchipuramInstalled 60KL + 80KL Bio STP
Rameshwaram Cafe BengaluruInstalled 270KL Bio STP
Advaith International Academy, HosurInstalled 110KL Bio STP
Trusted across South India
Millions Litres treated daily without electricity
10+ Sectors served across multiple states
5+ States with active installations
100% In-house engineering & manufacturing

More installations, site visits & project updates on our social channels.

Ready to stop managing sewage — and start forgetting it?

Free consultation & design support. Factory-made, delivered and installed across India.